Back to homepageFor construction admins

The details are there. Build the report.

Work from the photos, locations, statuses and notes the site team has already captured. Choose the records for a trade follow-up, project meeting or handover report.

The way it usually goes

  • Photos need matching back to rows in a spreadsheet.
  • Missing locations and details mean another round of follow-up.
  • The same information is reformatted for each report.

Illustrative current product workflow.

Keep the inputs together

Photos, locations, trades, priorities and status stay with each item record.

Choose a useful scope

Filter the records by status, priority or contractor assignment before generating a report.

Share a clear document

Generate the PDF, review the output and use QR links to provide access to the underlying evidence.

For construction admins

How the work comes together.

Capture the details, make responsibility clear and keep progress connected to the same record.

  1. 1

    Review the inputs

    Check the project lists and the records that belong in the report.

  2. 2

    Set the scope

    Choose the title, notes and filters for this report.

  3. 3

    Generate and review

    Produce the PDF from the existing records and check it before sharing.

Common questions

Can I prepare a report before every item is closed?

Yes. Choose the records for the report, including outstanding, in-progress and reviewed items. Generate the PDF from their captured photos, locations, trades, priorities, statuses and notes, then check the output before sharing. Repair approval remains with the authorised project team.

Do report recipients need a SiteWarden account to open QR evidence links?

No. Report QR links open read-only shared pages with the selected item’s details, photos and playable videos. They do not let recipients edit the defect or submit contractor updates. Anyone holding the report can open its evidence links, so share it with intended recipients.