Back to homepageFor project managers

Track defects and the next action across your project.

Keep punch list items and construction defects connected to the project, the responsible trade and the evidence. Use the desktop workspace to review what is open and follow up with the details at hand; desktop access is included in Professional and Business.

The way it usually goes

  • The latest status is buried in a call or a message.
  • The site walk produces another list that needs reconciling with the office copy.
  • Preparing a progress report means chasing the photos and details again.

Illustrative current product workflow.

Project and list visibility

Review open, in-progress and resolved items with the field details already attached.

A useful starting point for follow-up

Use contractor, trade, priority and status to focus on the work that needs attention.

Clear reporting

Select the records you need and generate a PDF for the next project conversation.

For project managers

How the work comes together.

Capture the details, make responsibility clear and keep progress connected to the same record.

  1. 1

    Review the list

    Check outstanding work and recent activity in the desktop workspace.

  2. 2

    Coordinate the next step

    Review ownership, priorities and supporting evidence with the team.

  3. 3

    Share the position

    Prepare a report from the records your site team has already captured.

Common questions

How can I prepare a project meeting report while defects remain open?

Choose the project records needed for the meeting and generate a PDF with their photos, locations, responsibility, priorities and current statuses. You can report outstanding, in-progress and reviewed items. A report does not accept a repair or determine practical completion.

What information helps me follow up outstanding work?

Keep a location, issue description, responsible trade or contractor, priority and current status with each item. The project team maintains the status and reviews completion evidence before closure. Contractors can add updates and evidence to assigned work while source details remain controlled by the authorised team.