Back to homepage

Sample Construction Defect Report

Explore the Banksia Townhouse sample handover report — photos, floor-plan locations, priorities, due dates and QR evidence links in a shareable PDF.

Judge the finished document, not the promise.

See 10 outstanding items across bedrooms, living areas and wet areas, with a summary, linked floor plan and a detail page for each item. This illustrative project uses fictional inspection items, AI-generated photos and a sample floor plan.

10 outstanding items3 site lists16 report pages
Banksia Townhouse sample handover report coverBanksia sample report item with photos, a floor-plan pin, status, due date and QR code

Set up the report

The builder controls the template, date, title, notes, and which defect statuses are included.

Filter the scope

This sample includes 10 open items across the Bedrooms, Living areas and Wet areas lists.

Review the output

The 16-page PDF includes a summary, linked floor plan, item photos, priorities, due dates and QR evidence links.

What the report includes

SiteWarden reports are designed for defect closeout, contractor accountability, and building handover control. The current report flow supports branded PDF-style output from selected defect records.

Item references

References such as BANKSIA-01 connect each item to the summary, floor-plan pin and detail page.

Photos and pins

Photo evidence and floor-plan pins keep the issue tied to the physical location.

Locations and assignments

Each item shows its area, element, issue and assignment. All items in this sample are unassigned.

Priority, status and due dates

Each item shows its priority, open status and due date so follow-up is clear.

Details and QR evidence links

Item descriptions and QR links keep the supporting evidence with each record.

Client-ready output

The report is generated from selected defect records so handover evidence is not rebuilt by hand.

Common questions

What is defect closeout software?

Defect closeout software helps construction teams capture defects, assign responsibility, track status, collect evidence, and prepare handover-ready records before practical completion.

How do builders track construction defects before handover?

Builders can track defects by project, list, location, trade, priority, contractor, and status so unresolved work is visible before client handover.

What should be included in a construction defect report?

A useful defect report should include defect IDs, photos, locations, issue notes, trade or contractor ownership, priority, status, floor-plan context, and a clear closeout record.

How can contractors be assigned defects?

Defects can be recorded with trade and contractor ownership so site teams can see who is responsible for rectification and which items are still open.

What is the difference between a defect list and a punch list?

A punch list can include unfinished work as well as defects. A defect list focuses on work that needs correcting. SiteWarden uses the same capture, assignment, status and reporting workflow for both.

Can SiteWarden create client-ready defect reports?

SiteWarden includes a report flow that turns selected defect records into a branded PDF-style report with photos, locations, status, priority, trade, and contractor context.