Set up the report
The builder controls the template, date, title, notes, and which defect statuses are included.
Explore the Banksia Townhouse sample handover report — photos, floor-plan locations, priorities, due dates and QR evidence links in a shareable PDF.
See 10 outstanding items across bedrooms, living areas and wet areas, with a summary, linked floor plan and a detail page for each item. This illustrative project uses fictional inspection items, AI-generated photos and a sample floor plan.
The builder controls the template, date, title, notes, and which defect statuses are included.
This sample includes 10 open items across the Bedrooms, Living areas and Wet areas lists.
The 16-page PDF includes a summary, linked floor plan, item photos, priorities, due dates and QR evidence links.
SiteWarden reports are designed for defect closeout, contractor accountability, and building handover control. The current report flow supports branded PDF-style output from selected defect records.
References such as BANKSIA-01 connect each item to the summary, floor-plan pin and detail page.
Photo evidence and floor-plan pins keep the issue tied to the physical location.
Each item shows its area, element, issue and assignment. All items in this sample are unassigned.
Each item shows its priority, open status and due date so follow-up is clear.
Item descriptions and QR links keep the supporting evidence with each record.
The report is generated from selected defect records so handover evidence is not rebuilt by hand.
Defect closeout software helps construction teams capture defects, assign responsibility, track status, collect evidence, and prepare handover-ready records before practical completion.
Builders can track defects by project, list, location, trade, priority, contractor, and status so unresolved work is visible before client handover.
A useful defect report should include defect IDs, photos, locations, issue notes, trade or contractor ownership, priority, status, floor-plan context, and a clear closeout record.
Defects can be recorded with trade and contractor ownership so site teams can see who is responsible for rectification and which items are still open.
A punch list can include unfinished work as well as defects. A defect list focuses on work that needs correcting. SiteWarden uses the same capture, assignment, status and reporting workflow for both.
SiteWarden includes a report flow that turns selected defect records into a branded PDF-style report with photos, locations, status, priority, trade, and contractor context.