Estimate rework costs and the time spent on defects.
Use your own monthly costs and reporting time to model a possible improvement. The 30% starting value is an illustrative target, not a measured SiteWarden result. Change it to suit your project, then compare the estimate with what your team actually records.
Product and record-keeping guidance by SiteWarden. Read the linked source in its stated jurisdiction and project context, and use the project’s authorised people for contract, technical or compliance decisions. How these guides are reviewed.
Model your monthly costs and hours.
All amounts are AUD. Starting values are examples. The 30% reduction is an adjustable target, not a measured product result. Calculations stay in your browser.
Change an input to update the scenario.
$36,000 over 12 months at the same monthly baseline and target.
60 hours over 12 months at the same monthly target.
Cost and time results are separate. If labour is already included in rework costs, adding the two savings can count it twice. Validate the targets with your own project records.
Start with a consistent baseline
Choose one reporting period and one project scope. Rework might include replacement materials, repeat installation and the labour needed to correct the affected work. Keep the definition consistent between your baseline and your follow-up measurement. This worksheet accepts a monthly rework amount; it does not estimate the amount from a project’s contract value.
- Use costs you can trace to the chosen project or period.
- Separate observed costs from provisional estimates.
- Record defect capture and report preparation hours using the same monthly period.
Treat the percentage as a target
The calculation multiplies the monthly rework amount by your chosen reduction target. At an illustrative AUD $10,000 per month and a 30% target, the scenario is AUD $3,000 per month. Those are inputs and arithmetic, not a promise that software will deliver that outcome.
A clearer defect record can support earlier follow-up and better reporting. The actual rework outcome also depends on design decisions, workmanship, timing, site access and how the team acts on each finding.
Measure the repeated reporting work
Time SiteWarden’s capture-to-report workflow against your current process using the same site list. Include recording the item, locating photos, typing descriptions, checking the location and preparing the PDF. In SiteWarden, photos and details stay with the record and the report is built from selected records.
- Include review time when comparing the two workflows.
- Keep the same number and type of items in each exercise.
- Enter the observed improvement in hours instead of assuming every recorded hour disappears.
Keep costs and hours separate
The worksheet shows rework savings and time savings separately. Labour already included in the rework cost may overlap with the recorded hours, so adding both outputs can overstate the saving. Use the result as a planning worksheet and validate it against project records.
Professional costs AUD $14.99 per month and Business AUD $20.99 per month. Both include the internal team and a 14-day trial. Review the current plan inclusions and test the workflow with your own evidence before calculating a business case.
Does SiteWarden guarantee a 30% reduction in rework costs?
No. The calculator’s 30% starting value is an illustrative target, not a measured SiteWarden result or a guaranteed saving. Replace it with your own target and validate the result against project costs.
How are estimated rework savings calculated?
Estimated monthly rework savings equal your monthly rework cost multiplied by the selected reduction percentage. The annual scenario multiplies the monthly estimate by 12 and assumes the same baseline and target each month.
How can I measure time saved on defect reports?
Time your current capture, review and report preparation steps, then repeat the exercise with the same type and number of items in SiteWarden. Compare the observed hours and keep the reporting period consistent.
Bring your list.
We’ll walk you through it.
Unfinished work, defects and the details in between. See how the current app captures, organises and reports on them.