Field guide

A working defect register with a clear record for every item.

A construction defect register follows findings from capture through review. It connects the issue to its location, evidence, responsibility and progress. Download the standalone spreadsheet template and adapt it to how your project records decisions.

Product and record-keeping guidance by SiteWarden. Read the linked source in its stated jurisdiction and project context, and use the project’s authorised people for contract, technical or compliance decisions. How these guides are reviewed.

A practical starting point

Download the defect register.

A free CSV worksheet with fields and illustrative entries. Edit it in your spreadsheet app for your project. This is a standalone worksheet; it is not a SiteWarden import file or an approved inspection specification.

Download CSV
Preview of illustrative entries. The download includes additional fields.
ItemLocationWork descriptionTradeNext action
EX-001Ground floor / living roomPatch the visible gap at the skirting junction.CarpenterConfirm repair and arrange review.
EX-002Level 1 / bedroomComplete the missing paint finish beside the window.PainterRecord the work required and responsible person.
EX-003Ground floor / entryReview the damaged door finish shown in the photo.JoinerAgree the remedy before carrying out work.

Give each finding a stable reference

Create a reference that remains with the item when someone sorts the spreadsheet or generates a report. Keep the project and list beside the reference. A row number is a poor reference because it can change when the sheet is rearranged.

Use one row for one finding. An entry such as “paint, doors and tiles downstairs” combines separate locations and responsibilities. Individual records make it easier to discuss the right work and attach the right evidence.

Keep the columns useful for the next person

The free CSV includes fields for the finding, location, evidence and follow-up. It also provides room for review notes so a new status has context. Adapt the labels to your project; the example vocabulary is not a mandated SiteWarden status list.

Keep an observation separate from a proposed repair when the repair needs approval. If responsibility is unresolved, record the person who will clarify it rather than assigning a trade on an assumption.

  • Reference, project, list and precise location.
  • Element, observed issue and relevant requirement.
  • Photo or other evidence reference.
  • Trade or person responsible for the next action.
  • Priority, current progress and next review.
  • Reviewer, outcome and supporting review notes.

Update the register after the review

A register needs an agreed owner and a review routine. Before a coordination discussion, look for missing responsibility, unclear observations and work awaiting review. After the discussion, record the next action and the evidence or clarification still needed.

Keep a report of completion distinguishable from acceptance by the authorised reviewer. Preserve the original issue description and photos. If the work needs another visit, explain what remains to be checked so the follow-up does not restart from an empty row.

Keep the live register separate from a report snapshot

A defect register tracks changing work. A PDF report shares a selected view at a particular time. Use the same finding references across the two so the recipient can refer to an item without describing it again.

The Banksia Townhouse sample shows this reporting idea using 10 fictional outstanding items across three lists. Its 16-page PDF demonstrates the output format. These counts describe an illustrative sample, not customer defect volumes or a measured closure rate.

Use the spreadsheet or assess the app workflow

Download the free CSV and open it in a spreadsheet. Replace the illustrative rows and agree who will maintain the file. The download is a standalone tool; this page does not offer CSV import into SiteWarden.

SiteWarden keeps media and record details together under projects and lists. The free Starter plan allows one person, one active project and up to 50 records. Professional and Business include the internal team and desktop workspace. Bring your existing register to a demo and compare the capture, review and PDF steps.

A few more details

Common questions.

Still weighing it up? Talk to our team.

What is a construction defect register?

It is the working list used to follow construction findings, including their references, locations, evidence, responsibility and progress. Keep review decisions with the item so the register explains both the original finding and the next action.

Is this a free defect tracking spreadsheet?

Yes. Download the ungated CSV and adapt it in a spreadsheet. The entries are illustrative and should be replaced for a live project. It is a standalone template and does not provide CSV import into SiteWarden.

What is the difference between a defect register and a defect report?

The register is updated as work progresses. A report presents selected items at a point in time for a particular audience. Use stable finding references so an update or question can be matched to the same item across both records.

See it on your next site walk

Bring your list.
We’ll walk you through it.

Unfinished work, defects and the details in between. See how the current app captures, organises and reports on them.

Book a Demo