Bring the work and the paperwork together.
Download the editable handover checklist and defect list to prepare documents, the site walk and follow-up. Use your contract to confirm what is required.
Built for builders, project managers, and construction admins assembling the handover package at the end of a project.

Start with an editable worksheet.
An editable checklist for handover documents, walkthrough preparation and outstanding actions.
Download handover checklist CSVA separate editable register for individual findings, evidence references and review.
Download defect list CSVAdapt the fields to your project. The sample PDF shows app-generated report output; these standalone CSVs are not SiteWarden import files or approved technical inspection specifications.
Check the contract and applicable requirements for your project. Do not put passwords or access codes in the checklist; use an appropriate secure channel for access details.
Review the defect list before the client walkthrough and record outstanding items with responsibility, evidence and current status.
Assemble the handover documents progressively instead of chasing them in the last week.
Hand over a report of the documented observations and review outcomes, including work still outstanding.
The handover document package
Use the contract and project requirements to identify the handover documents. Collect them progressively as trades finish so the team can check what is still missing before the walkthrough.
- Compliance certificates: electrical, plumbing, gas, glazing, waterproofing, and termite protection where required.
- Occupancy permit or certificate of occupancy where the project requires one.
- Warranties from subcontractors and manufacturers, with start dates and contact details.
- Operation and maintenance manuals, as-built drawings, keys, remotes, and access codes.
Review outstanding work before the walkthrough
Walk the works internally first, arrange rectification and review completed work. Keep remaining items visible for the client walkthrough. Handover acceptance depends on the contract and authorised review, rather than every report entry being closed.
- Every open defect assigned to its contractor with photos and location.
- Contractor completion proof collected against each item, not in a message thread.
- Builder-side verification before anything is marked closed.
- A generated report showing selected open, in-progress and reviewed items with their current status.
The walkthrough and the record
Walk the client through the works, record anything new they raise as fresh defect items, and close the visit with a report both sides can rely on.
- New walkthrough items get captured with the same structure as the PC list.
- Agreed items, timeframes, and exclusions are recorded rather than remembered.
- The report documents the observations, outstanding work and review outcomes recorded at the walkthrough. It does not certify the condition of all or concealed work.
Why the handover record keeps mattering
If questions arise after handover, photos, review notes and reports give the team a record of what was documented. The contract and the circumstances determine responsibility for the work.
- Compare later findings with the handover record and obtain the appropriate assessment of their cause and responsibility.
- The same project record carries post-handover rectification with the same evidence trail.
- SiteWarden generates the handover defect report from records captured during closeout — nothing is rebuilt by hand.
How does a handover checklist relate to a defect report?
The downloadable handover checklist helps the team prepare documents and plan the walkthrough. Use the separate defect list for individual findings and follow-up; a defect report shares selected findings, evidence, responsibility and current status.
What should a construction handover checklist include?
Include the documents and approvals required by the contract, warranties and manuals, keys and access details, and a current defect list. The report should show documented observations, outstanding items, responsibility, status and review outcomes.
What documents does a builder hand over at completion in Australia?
Typically compliance certificates for regulated trades, the occupancy permit where required, subcontractor and manufacturer warranties, O&M manuals, as-built drawings, and keys. The contract sets the exact list, so work from it.
When does the defect liability period start?
Check the contract for the start date and obligations. Many contracts link the defect liability period to practical completion. The handover report records the observations and statuses captured at that time; it does not determine the contractual date.
What happens if the client finds defects at the handover walkthrough?
Record the finding with photos and location, assign follow-up and retain its current status in the report. The authorised project team reviews rectification. Whether an item prevents handover depends on the contract and the issue, rather than a software status.
Bring your list.
We’ll walk you through it.
Unfinished work, defects and the details in between. See how the current app captures, organises and reports on them.