What should a construction handover checklist include?
A closed and verified defect list, the compliance certificates and approvals the contract requires, warranties and manuals, as-built drawings, keys and access credentials, and a defect report recording the condition of the works at handover.
What documents does a builder hand over at completion in Australia?
Typically compliance certificates for regulated trades, the occupancy permit where required, subcontractor and manufacturer warranties, O&M manuals, as-built drawings, and keys. The contract sets the exact list, so work from it.
When does the defect liability period start?
At practical completion under most Australian contracts. That is why the handover defect report matters: it records the condition of the works on day one of the DLP.
What happens if the client finds defects at the handover walkthrough?
They get recorded as defect items with photos and locations, assigned for rectification, and closed with verification like any other defect. Minor items do not usually delay handover if the process for closing them is clear.
What is defect closeout software?
Defect closeout software helps construction teams capture defects, assign responsibility, track status, collect evidence, and prepare handover-ready records before practical completion.
How do builders track construction defects before handover?
Builders can track defects by project, list, location, trade, priority, contractor, and status so unresolved work is visible before client handover.
What should be included in a construction defect report?
A useful defect report should include defect IDs, photos, locations, issue notes, trade or contractor ownership, priority, status, floor-plan context, and a clear closeout record.
How can contractors be assigned defects?
Defects can be recorded with trade and contractor ownership so site teams can see who is responsible for rectification and which items are still open.
What is the difference between a defect list and a punch list?
Both terms describe outstanding work before handover. Punch list is common in the US, while defect list or defects report is more common in Australian construction closeout.
Can SiteWarden create client-ready defect reports?
SiteWarden includes a report flow that turns selected defect records into a branded PDF-style report with photos, locations, status, priority, trade, and contractor context.